Monday, 25 February 2019

Grain Elevators part 3

Here are some pictures of the completed National elevator. That leaves only 5 more to finish. The office for this elevator is beside the elevator because of a lack of space on my layout. It is not a common position in Western Canada but did appear. You will get to see it better installed pictures in a future post on the scenery for Waldron. You can just make out the lighting rod above the roof hatch. There will be an annex that will go on the other side and will be done in the next month or so.


Here you can see the Rear of the Ford 1 Ton on the lift. The decals are custom made. The driveway in to this elevator is at ground level because of the depth of the cut that the tracks run through. This was not very common but did occur. The small door at the bottom of the wall leads to a small walkway between the bins on the inside.

In this picture you can see the front of the Ford 1 Ton that is on the lift. The pipe coming out the side is for loading grain in to a truck outdoors. Could be clean grain or screenings from the cleaner floor.

Shows the driveway floor and the outline for the scale. The edge of the scale usually has a piece of belting to fill the gap between it and the main floor. The grating over the pit was done with scale 1"x2" glued in on edge. There is a pit under the grating .You can also see the beam for the scale

This show the cleaning floor. Maybe some day I will get around to detailing this floor but I would first have figure out how to build a Carter Day 245 and disk cleaners. Maybe a larger fanning mill. There would have normally been stairs going up to the cleaning floor but because I have cut this elevator down to 35' the stairs would have been to steep, so the ladder was installed.

This shows the back leg and hopper along with the chutes coming from the bins.


Shows the truck hoist in the raised position without the truck on it. The LED is mounted between the floor joist on the cleaning floor. The pipe that is tied up is for loading trucks.

A look at the black board shows that most of the bins have grain in them. The tool between shovel and the broom is a flat piece of metal with a handel welded to it and is used to clean out the corners of the truck box without having to reach over the back of the truck with a shovel. You would just go through the tailgate and pull out the grain.

Here is look inside the office. The agent is helping the farmer fill in his permit book for 1959. That is the LED in the corner by the door. Everything in the office is scratch built.




Thursday, 21 February 2019

CNR 150T Coal Tower

I scratch built this from CNR plans with modeller liberties.These plans came in a bundle from the CN Lines. I drew up the tower on my Cad program. I draw in Cad at 1:1 and then I printed it off at scale. See How I scratch build At the time there were no kits or plans for wood towers for CN coal towers that I could find. There was a nice kit made by Kanamodels although they have closed their business. I do not have any pictures during construction as I didn't take many of those pictures back when I was building this structure.
This is built from styrene except for the wood retaining wall. This dock is at the end of it's life and will be retired in 2 more years with the end of steam.


This is a view looking back from the ash pit on the west side of the yard.

The CNR plans were for a 300 ton 3 track plant. When I drew it up I cut it down to only 150 ton with two tracks because of space restrictions. In the plan there would have been 2 tracks going underneath the tower. The model is built from styrene sheet and some wood 12x12 beams on the roof of the unloading shed and the retaining wall. There are also steel supports that hold the beams in the roof in place.The stucco is made using the same methods as I used for the 2nd class station. The rooftops are sandpaper representing a tarred roof. The doors, windows,walkway railings, chain drives and coal chutes are Tichy. The windows were reworked a bit to be more accurate for CN. There are little cleats on the concrete pillars to tie back the chains. The unloading grating was built from some screen that I had around and I added 2"x12" planks to it so workers could walk on it to open chutes on the cars. The upper walkway grating is from Plano and the chain is from A-line. There is a light in the unloading bay and on the poles at the outside corners of the walkways using SMD LEDs. The track to the unloading bay and under the tower is code 55. The rail on the outside chutes is code 70 same as in the yard tracks. I then did weathering on it using my air brush and chalks. Not really too tough a build except for getting slops on the hoppers right on the bottom of the tower and the unloading hopper. The structure was formed from .04 plain styrene and some tubing for the hopper concrete posts. The raised ground level for the pit was made using foam insulation. This model has to be movable so that I can access the track work behind it if repairs are necessary. I have not yet completed the scenery behind it including painting the backdrop. This view shows the unloading pit. There are planks 2"x12" that are movable for the workers to walk on to get out to open chutes on the hopper cars and the grating spacing is closer on the left side. There is also a pit under the grating.
  

This is looking at the entrance to unloading from the east. The rise from grade to pit level is 5'. The unloading track then starts to descend to the ash pit which is just behind the top of the passenger car. There is room to unload 4 cars at a time. The cars are not spotted because of the grade, it is easier for the yard crew just to dump the cars while still coupled to a locomotive. There are yellow height restriction signs on the support leg on the left. There are also signs further out on the approach track that passes the left side of the tower. There had already been one incident of a transformer on a flat car taking out the side chutes.


This shows the back side. This picture is very difficult to get when it is in place on the layout. The chutes will go up and down but I do not move them very often as they are very delicate



This shows the night lighting




Any questions my email is on the about me page.
  

Wednesday, 13 February 2019

CN Water Tower

I just finished this CN Water tower. It is scratch built from styrene. I used plans from CN Lines along with some notes and pictures that I have found. the windows, water level indicator and chimney were what I used from a Kanamodels kit I got at the swap meet. Someone had tried to built it so most of the parts were not usable. This octagon was a tougher build than I thought it would be. I drew it out in CAD and still had to make adjustments to wall width a couple of times. I had to develop a plan to get them all together to see if the would work out to the right width in the end. The roof worked out better but there is a little more latitude to the roof for some room for error. The one thing that I never did check was the height of the water pipe when it was in the down position. On the OH-SHOW-ME drawing it said it should be 10' above the rail. I knew how high my road bed and rail is so I added that and built away. What I should have check was how high some of my Vandi tenders are. So in the end it will sit on a small hill to gain the 40" needed to fill a 4-8-2. These buildings are like grain elevators when you start looking at pictures there doesn't seem to be 2 exactly the same. The walls are .04"x.06" spaced Evergreen siding. The windows are salvaged from the kit and the door is scratch built. The level gauge and chimney were also salvaged from the kit and everything else is my own material. I did add the plastic window material with the mullions painted on but I think I will take them off as most of the windows that broke over time were changed to just plain single sheets of glass. Less maintenance and cheaper. This water tower lives in Atwater on the layout.

This shows the base and walls once it was glued together.

This picture shows the walls and the bracing for the water spout. I added bolts to the bracing.It is masked because the foundation has been painted already.
A closer look at the bracing for the water spout. In the end the bracing should have been moved up to one board below the window. Then I would have had to only add 20" of fill under the base of the tank.
Here it is withe the painting (CN red #11) done and the windows installed.and the door finished. I use Catwisker yellow for all my CN cream colour.
Here is the completed model with the tar paper roof and fascia boards installed The tar paper is just masking tape and the fascia is scale 1"x6" styrene. There was 1'x8" and 1"x6" used on the door. The foundation is from Styrene strip. The water spout was also salvaged from the kit.

I will add a picture of the tower in place once the scenery at Atwater progresses.


Saturday, 26 January 2019

Farm Details 3 "3D printed models"

  I would encourage you to go take a look at Shapways for farm equipment and tires. Shapways prints 3D models that customers have drawn up. Look at farm equipment in all scales because you can ask any of the shops if they would print it in HO scale. This is very easy for them most of the time to change scales within their drawings. There maybe the issue that it is too small for HO but if you look at some of the Z scale items I doubt it. Over the past year there has been a lot more models added and the site is getting easier to search than it used to be.
  Pay attention to what material it is printed with and the fact that a lot of the models do not show a built model just the 3D rendering. Once you see a built model you will understand. "Smooth fine detail plastic" is smooth and "natural versatile plastic" has a sand paper texture but costs less. You can see the difference between some of the pictures. It is your choice how to have it printed most of the time. Pay attention to what scale you are looking at as scales larger than HO scale will cost less and N and Z will cost more to have it printed in HO.
Just do a search using Farm Equipment to start with. You will then go through builders pages to see what they have. There are some things from Europe that look interesting but need translation. There are some models that are listed as HO.
  If you are scratch building the amount of tractor and implement tires that are out there is huge now. There are even a few motors now being printed like flat head V8, V6 and small diesels.
  I wish that someone would do a 12hp Briggs and Stratton that I need for the Mayrath grain auger I want to build. The next thing would be a plain old 15" tire and rim. There was lots of equipment that used this type of tire. It was common to put 2nd hand questionable tires on certain things.
  The pieces that I am most interested in and looking at are the thrashing machine, Ford 8N snow tractor, the bale elevator if it can be done in HO, some horses with harness, birds, some interesting older Gleaner combines, NH side delivery rake and combine headers.
  I wish I could draw 3D because there are some other smaller things that I would like. I now have access to a laser cutter so there are some things like my diamond harrows and cabs for the JD 4010 tractors that I will get done using that. Yes I am cheating with the 40 series tractors for my era by a year.

Here are some links and by no means this is all of them but it will give you an idea and a start.
www.shapeways.com/shops/dennys3dtrucksandfarmacc
https://www.shapeways.com/shops/lazyffarmtoys
https://www.shapeways.com/shops/nvrr49?li=pb
https://www.shapeways.com/shops/tracmodel
https://www.shapeways.com/shops/modelsupplies
https://www.shapeways.com/shops/baldyloxdesigns
https://www.shapeways.com/shops/cb-customs-farm-models
https://www.shapeways.com/shops/verses
https://www.shapeways.com/shops/catzpaw-innovations
https://www.shapeways.com/shops/cb-s-designs

Saturday, 19 January 2019

Grain Elevators Part 2 National

As I am working my way around my layout finishing the scenery from the small shelf up to Waldron. Waldron has two elevators a P&H and a National that I have to complete by adding the driveways and some other details. I thought I would give a post on these as they get completed. I  finished the CAD drawings for the driveways.
Here is a picture of what they are or have been for a while. I didn't get the rest of the building built because at the time I at least wanted the main body modelled so that a train passed something. You see that the National has a square false front which really was not that common. The National decal was custom made and the decal for the P&H came from a Microscale set. Other details of note are the wood roof hatches. Agents would shovel the dust that accumulated on the floor at the top of the leg where the distributor was out this opening. On the National there are some singles that have been patched. I put a piece of tape over that section of shingles before I air brushed the weathering on the rest of the shingles. The body colour is light iron oxide which was used a lot because it was cheap and held its colour well. To paint an elevator today it would cost $$$$. This scene is loosely based on Ernfold Saskatchewan were the track went through a similar kind of cut so the entry to the driveway was at ground level which is not very typical in Western Canada but is more common in the US.


Here is a picture of the back side. The only disadvantage to having the elevators set up like this is uncoupling cars can be a bit of a challenge but it does put the driveways next to the isle. You can see the folding platform that is at door level with the car. The rail above that is the track for the doors.

Here is what my cad drawing for the driveway looks like. Some of the parts on the right are for an extension that you see on some driveways and will be on my next elevator. My drawings are not meant to be professional as they are not for sale.


Here are the pieces laid out after being cut out. Going clock wise from the top left. The paper cut out for the back hopper, the black piece is the 4'x8' chalk board, the driveway floor with the metal slats installed over the unloading pit, the doors for driveway entry at both ends, the roof for the little extension next to the scale and the driveway roof panel with the paper with the shingles line glued to it. The same is on the little roof. The stick on the little roof I glued on so I had a handel when I was spraying the styrene with glue befor attaching the paper.

This picture shows the outside wall for the driveway with the man door and extension installed, the back hopper and the template that it was cut out from, the front leg from the unloading pit, the end walls of the driveway and the center section that has the hole for the leg and the walls for the bins.




So I drew out the hopper in CAD, printed it, cut it out and glued it to .01 styrene sheet and cut it out. Then folded the hopper and glue it together one side at a time. I also then added a scale 12" high extension to the top of the hopper that is not shown. I just cut out another paper to show what it would have looked like. The one that was glued to the styrene is lost when I wash it off.

In the next post I will show the painted, shingled and partially assembled parts along with other details.


Friday, 4 January 2019

"Model Railroads" the book 1954

My friend Brian Small gave this book Model Railroads that was printed in 1954 which would have been nice to have a long time ago. Brian thought I would find it interesting and a good fit to have a book writen close to my era. Having said that, if I had seen it for sale I most likely would have dismissed it as being too old and maybe plain. Here is a picture of the cover and on the spine the only words are Model Railroads. The copyright is 1954 and the Library of Congress number is 54-12466.

The part that amazes me about this book is that the operations portion of the book could have been written in the last 10 years. It is amazing to see the vision Frank Ellison had for modelling operations that advanced back then. The only thing that would give this books date away to the reader would be some of the rolling stock and some of the scenery techniques.
I guess my point is that if I had had this book I could have skipped a lot of the other reading that I have done around track planing and operations. I also could have skipped the fatal error that just about everyone makes by not paying attention to operations.  We really have not invented anything new over that time period, Frank Ellison really had a grasp of this topic with his diagrams, text and pictures. It is too bad that it is not available as an ebook or PFD because every person who is starting a layout or rebuilding one should get to read this book. It did use some reprinted material from Model Railroader magazines from 1949, 1950 and 1951. It is another gem that I happen to have in my collection of books. I have started putting it out during operations sessions for ops to look at during down time.


Saturday, 29 December 2018

Sources for building plans

This is just a quick post. Since I scratch build a lot I have always been on the look out for building plans. These apply to my era but some of them can apply to new more resent eras. Now not all these plans give you every measurement but you can easily fill in any blanks if needed. I redrawn some plans from these sites, I just haven't had the time to build them yet. They will get built as I, work my way through the rest of my scenery.

North Dakota State University Has a lot of farm building, tools, livestock equipment, grain and some house plans. You will notice in one column the year the plan can out.

Colorado State University This also has a lot of farm building, tools, livestock equipment, grain and some house plans. You will again notice in one column the year the plan came out.

Sears House Plan Archives This one is interesting if you are looking for older house plans plus you get some history about Sears also.

Shorpy Photos are just really nice pictures that can show you details of older eras that you would not normally get to see.





Saturday, 22 December 2018

Farm Details 2 JD Combine


I had a couple of questions about where I got my John Deere 12-A combine from or did I scratch build it. The combine comes from GHQ Models and happens to look like a 12-A. It is a nice little combine. The actual machine was built from 1940-1951. So this model fits my 1959 era.  It has a PTO drive but the real combine also came with a "ULC" independent motor if your tractor didn't have PTO or live PTO.
John Deere then released the model 25 from 1952-1955 and then the model 30 from 1956-1961. The 30 combines are slightly different as they can have a pickup and have a table auger with enclosed  feeder house.
In this  era John Deere also released the model 65 in 1958 but there are no HO scale models of this machine currently available.
During this era John Deere also released 3 other self propelled models. The 55 1947-1959. The 45 1954-59. The 95 round back 1958-59. There are no HO scale models of these at this time. There are models in S scale so you could build a model taking measurements off of one of these.
Finding historical information on farm equipment is not very easy. Finding info on tractors is much easier. All of the above information applies to what you would have seen on the Canadian prairies. I am just scratching the surface of this topic as there are other manufactures such as Massey Harris which was a Canadian company that was a power in combines.

GHQ has some other nice models - as you will see on their page - that happen to represent real life machines.  North American farm equipment in HO scale of any kind is hard to find. To build this combine you just have to remove a little bit of flash from the metal parts and glue it together using CA or 5 min epoxy. The reels are etched brass and look really good but you have to take care working with them. I painted some of the drive belts black which takes a steady hand. I have a very small brush, you could also try using a tooth pick to paint with. The feeder house on this combine is canvas with wood slats. same as swather canvas. It is a light grey colour when new and the slats were unpainted wood. I had the decals custom printed as none come with the model. The model dosen't come with the straw spreader so I am considering building one. Because it is a 6' straight through I doubt the speader did much. I have added the straw deflector and the table lift arm though. The color of the reel bats are hard to tell as I only have black and white pictures - they may have been painted green. You can see in the John Deere add above they show reels and bats painted yellow. I painted mine plain wood with a little green colour as much of the paint would have been worn off by 1959.


Here are some pictures of the 12-A that is in Camrose at the museum. This has tines along with wood bats on the reels. It also has the independent ULC motor to drive it. The other thing of note when looking at this combine is that the combine is set to the left of the hitch. If you look at the hitch of a JD 65 the combine is on the right side of the hitch looking at it from the back. This change of rotation from going counter clockwise to clockwise around a field occurred on other towed equipment in the 40's and 50's. You can find lots of pictures and a few videos on the internet of any of these combines. I just can't post them because I do not have permisions.



 In this picture you can see where the motor is mounted on the left side in the picture. The hitch is swung over to the transport position. The canvas feeder is not installed. 



This John Deere add shows the model 30 with a motor drive. Note the pickup and table auger.

Sunday, 25 November 2018

Scenery part 2

 I am now working on the scenery from the edge of the small shelf  up to Waldron which is on the right side of my layout drawing. The buildings will be covered in different posts on there own.
 This is what it looks like at the start and how it has been for a while.
 In Oct I added the page wire fence on both sides of the right-of-way and painted the first coat on the telegraph poles to make them look aged. Some have the white paint on the insulators. They will get translucent green next to highlight the glass insulators.
That is a diamond harrow draw bar in the field at the back. I have not built the harrows yet but have them drawn in CAD. I am thinking of building a pull type rock picker to add to the scene also. I have made the drawings for it.
 You can see the white sign for Waldron, the small one further back is the whistle sign and the one closer to the bridge is the flanger sign.
 I also have just painted the backdrop. This field has just been seeded.
 The field in the front will be stubble that is being summer fallowed.
 There is a barbed wire fence that will get added coming out to the front. And one going to the back on the other side of the track.


This shows where the oil pump jack is going to go. Not really a Saskatchewan thing but I spent a lot of my career in the oil patch be it in large plants. But back in 1978 a farm kid from Sask worked for a year for a company out of Nisku Alberta that repaired these and we traveled all over the province. The steel bins are just resting there for now. These bins model 1650 bushel 5 ring Westeel or Rosco bins. They are actually Rix N scale bins that scale out really well. If you take 1 row of rings off you would have a 1350 and if you add a row you would have a 1950.
I have painted in the road on the back drop. The monument and sign just to the right of the bins is where the last spike went in back in 2010. You can also see the flanger sign.

Also painted some more back drop and built the snow fence in Oct

The elevators have to be finished, an anex for one or both and a coal shed. I find it interesting in this photo that the road at the back that is painted actually goes in the other direction at about the same angle when you look at it straight on

This photo shows how far this series of posts will go. The rectangle drawn on the scenery is where the station is going. This will be an E Class GTP. That is a passing siding on the right.

The 2 red bins are scratch built and represent plywood bins that were relatively common and hold 1350 bushels. You can now see how the painted road has changed to the way it was painted, although the angle is a little steeper than it looks straight on.
There is a loading platform where the boxcar is sitting. The thing at the coupler on the gondola is the brakes. It is a pin with green tape on it. If a car will not sit still the crew can apply a brake. Still need to add the wheel stops to the ends of the rail. The idea is there will be a steel scrap pile where the gondola is currently sitting. Also still need fence on the right hand side of the right-of-way.


Here is closer look at the snow fence. It is all styrene with 1x4 and 2x6. The posts are 6x8. The grass it seems to photograph really brown so I will have to fix that. It is a light green but you just do not see it.

I will continue to add posts until this piece of scenery is complete.


Friday, 16 November 2018

Scenery part 1

I am currently working on scenery and thought I would take you along as I am working on it. This will be a series of posts.
 This narrow shelf is on the right had side of my layout drawing. It is 5' long and 4.5" wide. The scenery on this was completed in Sept. I painted the back drop, added the fence to the right-of-way, added the static grass, weathered the road bed and added a piece of snow fence. The bare spot at the end is the start of the next piece of scenery to Waldron. There is a strip of Plexiglas on the left to keep things off the floor. The shelf was built this small so there would be enough room to move things from the stairs to the other room.
 The page wire fence is some window screen cut 4 scale feet high. It is the closest thing I could find. The posts CN used were ceder mine are balsa stained to age them. I just cut the posts strips out of a sheet and then chopped them to length. The vast majority of the right-of-way had this type of fence because when these lines were built the vast majority of farmers had livestock. The barbed wire fence is styrene .02-.04 rod painted wood brown. The barbed wire is grey coloured thread. I ended up picking this colour as you can see it so it get bumped less.


 I can't remember who made the telegraph poles. I first drag the main pole with 80 grit sandpaper to give the plastic some wood texture. Next I weather them with white paint and black fabric dye see the link weathered wood on how to weather plastic to look like old wood. I then paint the insulators white acrylic and then paint them with a translucent green from Gallery Glass...... The last step is to paint the support braces a steel or dark oxide colour.


This is what they look like from start to finish




This looking back the other way. The farm is around the corner. You can see the whistle and flanger signs on the right side. The snow fence is between the 2 signs.

The bridge was covered in it own post CNR Wood trestle part 2






The finished scenery

Wednesday, 7 November 2018

Using JMRI for Operations

I thought this was an appropriate time to do a post on this topic as I have just recently done a tuneup on on my JMRI operations with some help from the JMRI users group and Dan in particular.  There were a few things that I needed to understand better to improve car movements. This extra knowledge will  enable me to help others also. I have been using JMRI since 2010 and it has worked well, I am just trying to make it run better in the prototypical way that I prefer. I also use TT & TO to run my operation sessions. When I started out I used car cards but found this to be a bit cumbersome and so I switched to JMRI operations which handles all my car movements. I never did get to the part of having to build all the card holders and such. Like most things in each system has a few points that may result in compromise.  Living  in the Edmonton area where we have 10-12 layouts doing operation sessions that use both methods there are always conversation about it. I also use JMRI Decoder Pro and can't imagine running without it - I will cover this topic in another short post. None of of my comments in this post are meant as a slag against how anyone else runs their operations.
The great thing about JMRI is that it is open source so you do not need to purchase it to get to play with any of its features. I use other open source programs like Libre Office, LibreCad, and  Gymp which are all open source programs that are free.
It does take a  bit of time to set it up very similar to creating all those car cards. The JMRI site gives you access to a very well written manual.  Now I know most of us are men and do not need to read manuals "hahaha"  but you do need to read this one, most likely a couple of times before you start. and a couple of times after that.
It does take a little maintenance but so does flipping all those car cards before each session. The purpose in using any computer program is to make repetitive tasks much easier and it does just that.
JMRI Operations generates manifests and switch lists for trains that are printed out on 1 or 2 pages, which is easier for new operators to use since they have a sheet that gives them instruction on what to do. There are even switch lists for the yard operators. They  do not have to handle a stack of cards which for a 30 car train is about an 1 1/4 " thick and for the yard ops this can be huge.  For example my yard is on the smaller side but still holds 70 cars. The other thing this does is tell operators exactly what track the cars are going to as you can see below in Melville. Below is a what a manifest for  through freight 715 looks like. Rivers is in east staging and Watrous is west staging. The one thing that JMRI operations doesn't do well is block cars so I use this manifest to block the cars before a session starts. This is done in staging.
The first paragraph is mostly instructions I have added. This way even new ops have this with them all the time they are on this train.
Rivers is really just showing what cars and power 715 is leaving staging with and what track their train will be on. In this case the train will be on track 6.
Next it shows places they will pass and that there is no work there.
Then we get to Melville and it shows what pulls and spots there are and what tracks the cars are going to or coming from. The yard master will usually sort the pull cars ahead of time to a track and if busy the yard master can have the train drop all the cars to track 2 to keep things moving and move them later.
Watrous shows what cars you have and what track you are going to in staging. All my trains depart and arrive on the same track in staging. Each track just has different virtual names. Upon arriving in staging the train is reversed on the loop and then stored on its track. It will leave Watrous next trip as 716 east bound.


Manifest for train (715) West Through Freight
Valid 6/21/1959 17:29 (Tuesday)
At Rivers get your clearance, train orders and manifest
Drop cars to Track 2 at Melville and pick up cars from Track 3 West.
Or as instructed by Yard Master
At Melville take on fuel. Steamers can also take on water.
Get your clearance and train orders 10min crew change

Scheduled work at Rivers, departure time 07:00
 [ ] Pick up CN    9030   F7A      from Track 6                   
 [ ] Pick up CN    9037   F7B      from Track 6                   
 [ ] Pull    CN    478548 Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    LNE   352    Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    CN    500799 Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    CN    485338 Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    CN    483916 Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    CN    544559 Boxcar       40'  L< Boxes>    from Track 6                   -> Melville         
 [ ] Pull    NYC   168265 Boxcar       40'  L<Supliment> from Track 6                   -> Melville         
 [ ] Pull    GM&O  75003  Flatcar      40'  L<Ties>      from Track 6                   -> Melville         
 [ ] Pull    GTW   591599 Boxcar       50'  L<Auto>      from Track 6                   -> Melville         
 [ ] Pull    CN    479667 Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    CN    500899 Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    CN    526844 Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    CN    543790 Boxcar       40'  E<mpty>      from Track 6                   -> Melville         
 [ ] Pull    NYC   712675 Gondola      52'  E<mpty>      from Track 6                   -> Watrous          
 [ ] Pull    CN    78934  Caboose      36'               from Track 6                   -> Watrous          
Train departs Rivers Westbound with 15 cars, 792 feet, 830 tons

No work at Cana Jct
No work at Atwater
No work at Bangor Jct
No work at Waldron

Scheduled work at Melville, arrival time 07:30
 [ ] Spot    CN    478548 Boxcar       40'  E<mpty>      to Track 2                   
 [ ] Spot    LNE   352    Boxcar       40'  E<mpty>      to Track 2                   
 [ ] Spot    CN    500799 Boxcar       40'  E<mpty>      to Track 2                   
 [ ] Spot    CN    485338 Boxcar       40'  E<mpty>      to Track 2                   
 [ ] Spot    CN    483916 Boxcar       40'  E<mpty>      to Track 2                   
 [ ] Spot    CN    544559 Boxcar       40'  L< Boxes>    to Track 2                   
 [ ] Spot    NYC   168265 Boxcar       40'  L<Supliment> to Track 2                   
 [ ] Spot    GM&O  75003  Flatcar      40'  L<Ties>      to Track 2                   
 [ ] Spot    GTW   591599 Boxcar       50'  L<Auto>      to Track 2                   Ensure End Door Is Facing Ramp
 [ ] Pull    CN    110473 Hopper       40'  E<mpty>      from Track 3 West              -> Watrous          
 [ ] Pull    CN    533503 Boxcar       40'  E<mpty>      from Track 3 West              -> Watrous          
 [ ] Pull    CN    143201 Gondola      52'  E<mpty>      from Track 3 West              -> Watrous          
 [ ] Spot    CN    479667 Boxcar       40'  E<mpty>      to Track 5 Mixed East        
 [ ] Spot    CN    500899 Boxcar       40'  E<mpty>      to Track 5 Mixed East        
 [ ] Spot    CN    526844 Boxcar       40'  E<mpty>      to Track 5 Mixed East        
 [ ] Spot    CN    543790 Boxcar       40'  E<mpty>      to Track 6                   
Train departs Melville Westbound with 5 cars, 354 feet, 372 tons

No work at Burmingham Jct

Scheduled work at Watrous, arrival time 21:12
Reverse Train Before parking
 [ ] Set out CN    9030   F7A      to Track 6                   
 [ ] Set out CN    9037   F7B      to Track 6                   
 [ ] Spot    CN    110473 Hopper       40'  E<mpty>      to Track 6                   
 [ ] Spot    CN    533503 Boxcar       40'  E<mpty>      to Track 6                   
 [ ] Spot    CN    143201 Gondola      52'  E<mpty>      to Track 6                   
 [ ] Spot    NYC   712675 Gondola      52'  E<mpty>      to Track 6                   
 [ ] Spot    CN    78934  Caboose      36'               to Track 6                   

Train terminates in Watrous

The manifest  makes it easier for ops that are new to operations as everything is explained. There is also a switch list for the yard that shows what cars they need to spot and pull from local industries. I also have a train lineup sheet that the yard master can look at which tells what trains are coming including the extras which are not on the time table. I don't normally have a dedicated dispatcher except for me so it works well on my layout. The biggest thing I am trying to achieve is a less stressful atmosphere for new people to operate in.